Low Loader Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Low Loader Safe Work Method Statement
This Low Loader Safe Work Method Statement (SWMS) covers hazards and controls associated with the movement of plant (referred to as the load) using a Low Loader Transport vehicle.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.
Job Steps Covered in Low Loader SWMS:
(includes potential hazards and control measures)
- Planning
- Working Alone
- Coupling/Uncoupling the Low-loader
- Vehicle Operation
- Pick-up/Set-down of Load
- Environment
- Housekeeping
- Manual Tasks
- Refuelling
- On Completion
- General Emergency Response
We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Low Loader Safe Work Method Statement
This Low Loader Safe Work Method Statement (SWMS) covers hazards and controls associated with the movement of plant (referred to as the load) using a Low Loader Transport vehicle.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.
Job Steps Covered in Low Loader SWMS:
(includes potential hazards and control measures)
- Planning
- Working Alone
- Coupling/Uncoupling the Low-loader
- Vehicle Operation
- Pick-up/Set-down of Load
- Environment
- Housekeeping
- Manual Tasks
- Refuelling
- On Completion
- General Emergency Response
We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.