null

This Safe Work Month, buy any Management System and add 4 SWMS to your cart for FREE! Use code NSWM2023 at checkout. *T&C’s apply.

Men in hard hats and high vis

Hoist Personnel and Materials Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Hoist Personnel and Materials Safe Work Method Statement

This Hoist Personnel and Materials Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of personnel and material hoists.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Hoist Personnel and Materials SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Conduct a Pre-operational Inspection
  5. Hoist Operation
  6. On Completion
  7. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Hoist Personnel and Materials Safe Work Method Statement

This Hoist Personnel and Materials Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of personnel and material hoists.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Hoist Personnel and Materials SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Conduct a Pre-operational Inspection
  5. Hoist Operation
  6. On Completion
  7. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View