Hoist Personnel and Materials Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Hoist Personnel and Materials Safe Work Method Statement
This Hoist Personnel and Materials Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of personnel and material hoists.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Hoist Personnel and Materials SWMS:
(includes potential hazards & control measures)
- Training
- Planning
- Arrival On-site & Assess On-site Conditions
- Conduct a Pre-operational Inspection
- Hoist Operation
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Hoist Personnel and Materials Safe Work Method Statement
This Hoist Personnel and Materials Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of personnel and material hoists.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Hoist Personnel and Materials SWMS:
(includes potential hazards & control measures)
- Training
- Planning
- Arrival On-site & Assess On-site Conditions
- Conduct a Pre-operational Inspection
- Hoist Operation
- On Completion
- Emergency Response