Hoarding Installation Removal Safe Work Method Statement
This Hoarding Installation Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) and ladders to install and remove hoarding panels.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Hoarding Installation Removal SWMS:
(includes potential hazards and control measures)
- Planning
- Arrival on-site & assess on-site conditions
- Parking and material storage safety
- Work area set-up
- Environment
- Weather conditions
- General installation & removal of hoarding/barricades
- Working on scaffolding
- Post-removal safety inspections
- Emergency Response
We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Hoarding Installation Removal Safe Work Method Statement
This Hoarding Installation Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) and ladders to install and remove hoarding panels.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Hoarding Installation Removal SWMS:
(includes potential hazards and control measures)
- Planning
- Arrival on-site & assess on-site conditions
- Parking and material storage safety
- Work area set-up
- Environment
- Weather conditions
- General installation & removal of hoarding/barricades
- Working on scaffolding
- Post-removal safety inspections
- Emergency Response