null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

barricades, boarding

Hoarding Installation Removal Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Hoarding Installation Removal Safe Work Method Statement

This Hoarding Installation Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) and ladders to install and remove hoarding panels.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Hoarding Installation Removal SWMS:

(includes potential hazards and control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Materials Delivery
  8. Delivery, Set-up & Removal of EWP
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Installation & Removal of Hoarding Panels
  12. Fuelling the EWP
  13. Recharging
  14. On Completion
  15. Emergency Response

View Document Sample

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Hoarding Installation Removal Safe Work Method Statement

This Hoarding Installation Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) and ladders to install and remove hoarding panels.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Hoarding Installation Removal SWMS:

(includes potential hazards and control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Materials Delivery
  8. Delivery, Set-up & Removal of EWP
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Installation & Removal of Hoarding Panels
  12. Fuelling the EWP
  13. Recharging
  14. On Completion
  15. Emergency Response

View Document Sample

PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View