- Description
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian and New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
- Planning
- Implement a Falls Emergency Rescue Plan
- Arrival On-site and Assess On-site Conditions
- Work Area Set-up
- Environment
- Working Outdoors
- Housekeeping
- Manual Tasks
- Pre-inspect System
- Working on the BMU
- On Completion
- Emergency Response
- Document Sample
- Tutorials
Building Maintenance Unit BMU Safe Work Method Statement
This Building Maintenance Unit BMU Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of a BMU while cleaning windows and general building maintenance such as painting, window/glass replacement, cleaning etc.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips and Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work and Environmental Considerations.
Daily Swing Stage Checklist included with this SWMS.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Building Maintenance Unit BMU SWMS:
(includes potential hazards and control measures)