Equipment Assembly and Installation Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Equipment Assembly and Installation Safe Work Method Statement
This Equipment Assembly and Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the assembly/disassembly of mechanical equipment.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Equipment Assembly and Installation SWMS:
(includes potential hazards and control measures)
- Training
- Planning
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Equipment Delivery
- Assembly, Disassembly &/or Installation
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Equipment Assembly and Installation Safe Work Method Statement
This Equipment Assembly and Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the assembly/disassembly of mechanical equipment.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Equipment Assembly and Installation SWMS:
(includes potential hazards and control measures)
- Training
- Planning
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Equipment Delivery
- Assembly, Disassembly &/or Installation
- On Completion
- Emergency Response