Crane Self-Erecting Safe Work Method Statement

This Crane Self-Erecting Safe Work Method Statement (SWMS) covers hazards and controls associated with the setup and use of a self-erecting crane.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps covered in Crane Self-Erecting SWMS: 

(includes potential hazards and control measures)

  1. Crane Lift Planning
  2. Road Operation
  3. Arrival On-site & Assess On-site Conditions
  4. Environment
  5. Crane Placement
  6. Erecting the Crane
  7. Housekeeping
  8. Manual Tasks
  9. Establish a Communication System
  10. Select & Inspect Load Equipment
  11. Pre-lift Assessment
  12. Crane Pre-start Check
  13. Crane Operation
  14. Workboxes
  15. Daily Shutdown & Storage
  16. Maintenance On-site
  17. Re-fueling On-site
  18. On Completion
  19. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Crane Self-Erecting Safe Work Method Statement

    This Crane Self-Erecting Safe Work Method Statement (SWMS) covers hazards and controls associated with the setup and use of a self-erecting crane.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps covered in Crane Self-Erecting SWMS: 

    (includes potential hazards and control measures)

    1. Crane Lift Planning
    2. Road Operation
    3. Arrival On-site & Assess On-site Conditions
    4. Environment
    5. Crane Placement
    6. Erecting the Crane
    7. Housekeeping
    8. Manual Tasks
    9. Establish a Communication System
    10. Select & Inspect Load Equipment
    11. Pre-lift Assessment
    12. Crane Pre-start Check
    13. Crane Operation
    14. Workboxes
    15. Daily Shutdown & Storage
    16. Maintenance On-site
    17. Re-fueling On-site
    18. On Completion
    19. Emergency Response