Crane Self-Erecting Safe Work Method Statement
This Crane Self-Erecting Safe Work Method Statement (SWMS) covers hazards and controls associated with the setup and use of a self-erecting crane.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps covered in Crane Self-Erecting SWMS:
(includes potential hazards and control measures)
- Crane Lift Planning
- Road Operation
- Arrival On-site & Assess On-site Conditions
- Environment
- Crane Placement
- Erecting the Crane
- Housekeeping
- Manual Tasks
- Establish a Communication System
- Select & Inspect Load Equipment
- Pre-lift Assessment
- Crane Pre-start Check
- Crane Operation
- Workboxes
- Daily Shutdown & Storage
- Maintenance On-site
- Re-fueling On-site
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Crane Self-Erecting Safe Work Method Statement
This Crane Self-Erecting Safe Work Method Statement (SWMS) covers hazards and controls associated with the setup and use of a self-erecting crane.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps covered in Crane Self-Erecting SWMS:
(includes potential hazards and control measures)
- Crane Lift Planning
- Road Operation
- Arrival On-site & Assess On-site Conditions
- Environment
- Crane Placement
- Erecting the Crane
- Housekeeping
- Manual Tasks
- Establish a Communication System
- Select & Inspect Load Equipment
- Pre-lift Assessment
- Crane Pre-start Check
- Crane Operation
- Workboxes
- Daily Shutdown & Storage
- Maintenance On-site
- Re-fueling On-site
- On Completion
- Emergency Response