null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Crane work being conducted, crane holding a large pile of timber.

Crane Self-Erecting Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Crane Self-Erecting Safe Work Method Statement

This Crane Self-Erecting Safe Work Method Statement (SWMS) covers hazards and controls associated with the setup and use of a self-erecting crane.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps covered in Crane Self-Erecting SWMS: 

(includes potential hazards and control measures)

  1. Crane Lift Planning
  2. Road Operation
  3. Arrival On-site & Assess On-site Conditions
  4. Environment
  5. Crane Placement
  6. Erecting the Crane
  7. Housekeeping
  8. Manual Tasks
  9. Establish a Communication System
  10. Select & Inspect Load Equipment
  11. Pre-lift Assessment
  12. Crane Pre-start Check
  13. Crane Operation
  14. Workboxes
  15. Daily Shutdown & Storage
  16. Maintenance On-site
  17. Re-fueling On-site
  18. On Completion
  19. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Crane Self-Erecting Safe Work Method Statement

This Crane Self-Erecting Safe Work Method Statement (SWMS) covers hazards and controls associated with the setup and use of a self-erecting crane.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps covered in Crane Self-Erecting SWMS: 

(includes potential hazards and control measures)

  1. Crane Lift Planning
  2. Road Operation
  3. Arrival On-site & Assess On-site Conditions
  4. Environment
  5. Crane Placement
  6. Erecting the Crane
  7. Housekeeping
  8. Manual Tasks
  9. Establish a Communication System
  10. Select & Inspect Load Equipment
  11. Pre-lift Assessment
  12. Crane Pre-start Check
  13. Crane Operation
  14. Workboxes
  15. Daily Shutdown & Storage
  16. Maintenance On-site
  17. Re-fueling On-site
  18. On Completion
  19. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View