Crane Overhead Bridge Gantry Safe Work Method Statement
This Crane Overhead Bridge Gantry Safe Work Method Statement (SWMS) covers hazards and controls associated with operation of a bridge or gantry crane with both a manned cabin and remote controlled.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Crane Overhead Bridge Gantry SWMS:
(includes potential hazards and control measures)
- Planning
- Assess On-site Conditions
- Environment
- Housekeeping
- Manual Tasks
- Establish a Communication System
- Climbing the Crane
- Crane Pre-start Check
- Select & Inspect Load Equipment
- Pre-lift Assessment
- Crane Operation
- Maintenance On-site
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Crane Overhead Bridge Gantry Safe Work Method Statement
This Crane Overhead Bridge Gantry Safe Work Method Statement (SWMS) covers hazards and controls associated with operation of a bridge or gantry crane with both a manned cabin and remote controlled.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Crane Overhead Bridge Gantry SWMS:
(includes potential hazards and control measures)
- Planning
- Assess On-site Conditions
- Environment
- Housekeeping
- Manual Tasks
- Establish a Communication System
- Climbing the Crane
- Crane Pre-start Check
- Select & Inspect Load Equipment
- Pre-lift Assessment
- Crane Operation
- Maintenance On-site
- On Completion
- Emergency Response