null

Caulking Grouting Patching Safe Work Method Statement

Product SKU: 10412-6

Worker doing grouting work
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Caulking Grouting Patching Safe Work Method Statement

This Caulking/Grouting/Patching Safe Work Method Statement (SWMS) coversl hazards and controls associated with caulking, grouting and patching of concrete pre cast panels, block/brick work, concrete paving tiles and other building components.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Caulking Grouting Patching SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  9. Working Near Unprotected Edges
  10. Mixing & Applying Grouts & Patching Products
  11. On Completion
  12. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Caulking Grouting Patching Safe Work Method Statement

    This Caulking/Grouting/Patching Safe Work Method Statement (SWMS) coversl hazards and controls associated with caulking, grouting and patching of concrete pre cast panels, block/brick work, concrete paving tiles and other building components.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Caulking Grouting Patching SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    2. Working Outdoors
    3. Arrival On-site & Assess On-site Conditions
    4. Work Area Set-up
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
    9. Working Near Unprotected Edges
    10. Mixing & Applying Grouts & Patching Products
    11. On Completion
    12. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials