null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Red bricks being positioned to create a wall, person laying them into position

Brick and Block Laying Safe Work Method Statement

This Brick and Block Laying SWMS covers risk-management and controls associated with laying bricks and blocks for construction projects.

  • Instant Document Delivery via Email.
  • Add your logo easily.
  • Add or delete information to any SWMS template.
  • Customisation instructions provided.
  • Complies with Australian & New Zealand legislation.
  • Edit documents on the go with Microsoft Office Mobile App
  • Only pay once (no subscriptions required).

Brick and Block Laying Safe Work Method Statement

This industry-specific document is designed to meet your health and safety needs with a focus on workplace safety. Our team of experts has put together this comprehensive SWMS so that you can easily understand how to complete tasks with risk management in mind.

Also suitable for use with stone masonry, this SWMS will help protect workers and subcontractors on site.

Controls are included for working with Electrical Equipment, Elevated Levels, Slips, Trips & Falls around building materials, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Bricklaying Risk Assessment

Included is a comprehensive risk assessment matrix for bricklaying

Our documents are tailored to meet the needs of construction professionals, so you can work safely and efficiently. Plus, our risk assessment matrix is easy to use, making it simple to identify potential hazards and implement controls.

Comes with FREE Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Brick and Block Laying SWMS:

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Planning Access to the Height Location
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Brick Elevator Set-up
  8. Housekeeping
  9. Materials Delivery
  10. Manual Tasks
  11. Working with Powered & Non-powered Tools
  12. Hazardous Substance/Chemical Use
  13. Setting-out/Profiling Building Lines
  14. Mixing & Transporting Mortar
  15. Cutting Bricks &/or Blocks
  16. Laying Bricks &/or Blocks
  17. Core Steel Reinforcement (blockwork)
  18. Acid Washing
  19. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  20. Fuelling On-site
  21. On Completion
  22. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

This Brick and Block Laying SWMS covers risk-management and controls associated with laying bricks and blocks for construction projects.

  • Instant Document Delivery via Email.
  • Add your logo easily.
  • Add or delete information to any SWMS template.
  • Customisation instructions provided.
  • Complies with Australian & New Zealand legislation.
  • Edit documents on the go with Microsoft Office Mobile App
  • Only pay once (no subscriptions required).

Brick and Block Laying Safe Work Method Statement

This industry-specific document is designed to meet your health and safety needs with a focus on workplace safety. Our team of experts has put together this comprehensive SWMS so that you can easily understand how to complete tasks with risk management in mind.

Also suitable for use with stone masonry, this SWMS will help protect workers and subcontractors on site.

Controls are included for working with Electrical Equipment, Elevated Levels, Slips, Trips & Falls around building materials, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Bricklaying Risk Assessment

Included is a comprehensive risk assessment matrix for bricklaying

Our documents are tailored to meet the needs of construction professionals, so you can work safely and efficiently. Plus, our risk assessment matrix is easy to use, making it simple to identify potential hazards and implement controls.

Comes with FREE Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Brick and Block Laying SWMS:

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Planning Access to the Height Location
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Brick Elevator Set-up
  8. Housekeeping
  9. Materials Delivery
  10. Manual Tasks
  11. Working with Powered & Non-powered Tools
  12. Hazardous Substance/Chemical Use
  13. Setting-out/Profiling Building Lines
  14. Mixing & Transporting Mortar
  15. Cutting Bricks &/or Blocks
  16. Laying Bricks &/or Blocks
  17. Core Steel Reinforcement (blockwork)
  18. Acid Washing
  19. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  20. Fuelling On-site
  21. On Completion
  22. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

You May Also Need

Hear From Our Customers

  • 5

    Found very helpful

    Found very helpful

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View