Invest in Safety and Save This EOFY - Maximise your tax deductions with our range of HSEQ documents, tailored to your Industry. Shop our Industry Packages now and save.

People wearing full hazardous protection suits working from an EWP removing parts of a roof.

Asbestos Safe Handling < 10 sqm. Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement

This Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement (SWMS) covers hazards and controls when working with or removing small amounts non-friable asbestos less than 10 m2 in area. (No licence required).

This SWMS should be used for minor work in which asbestos or asbestos-containing materials (ACM) are encountered in the workplace. Examples may be drilling into, painting or replacing a small section of non-friable asbestos sheeting wall or removing non-friable asbestos lagging for a pipe repair.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Asbestos Safe Handling (< 10 sqm.) SWMS: 

(includes potential hazards & control measures).

  1. Planning
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Removing Small Sections (<10sqm) of ACM
  9. Removing Small Sections (<10sqm) of Asbestos Cement Sheeting
  10. Removing Small Sections (<10sqm) of Floor Tiles Containing Asbestos
  11. Removing Small Sections (<10sqm) of Bituminous Products, (i.e. roofing felt or roll roofing products)
  12. Removing Small Sections (<10sqm) of Ceiling Tiles Containing Asbestos
  13. Removing Small Sections (<10sqm) of Lagging on Pipework/Plant Containing Asbestos
  14. Working with Powered & Non-powered Tools on Asbestos
  15. Drilling Asbestos
  16. Paint/Repaint ACM
  17. Collection & Disposing of Asbestos Waste
  18. On Completion
  19. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement

This Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement (SWMS) covers hazards and controls when working with or removing small amounts non-friable asbestos less than 10 m2 in area. (No licence required).

This SWMS should be used for minor work in which asbestos or asbestos-containing materials (ACM) are encountered in the workplace. Examples may be drilling into, painting or replacing a small section of non-friable asbestos sheeting wall or removing non-friable asbestos lagging for a pipe repair.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Asbestos Safe Handling (< 10 sqm.) SWMS: 

(includes potential hazards & control measures).

  1. Planning
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Removing Small Sections (<10sqm) of ACM
  9. Removing Small Sections (<10sqm) of Asbestos Cement Sheeting
  10. Removing Small Sections (<10sqm) of Floor Tiles Containing Asbestos
  11. Removing Small Sections (<10sqm) of Bituminous Products, (i.e. roofing felt or roll roofing products)
  12. Removing Small Sections (<10sqm) of Ceiling Tiles Containing Asbestos
  13. Removing Small Sections (<10sqm) of Lagging on Pipework/Plant Containing Asbestos
  14. Working with Powered & Non-powered Tools on Asbestos
  15. Drilling Asbestos
  16. Paint/Repaint ACM
  17. Collection & Disposing of Asbestos Waste
  18. On Completion
  19. Emergency Response
PDF Download
PDF File

Hear From Our Customers

  • 5

    Prompt efficient service

    Prompt efficient service

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View