null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Antenna satellite dish on top of a roof

Antenna Satellite Dish Installation Safe Work Method Statement

This Antenna/Satellite Dish Installation SWMS covers hazards and controls associated with installation of antenna’s and satellite dishes on a roof.

  • Instant Document Delivery via Email.
  • Add your logo easily.
  • Add or delete information to any SWMS template.
  • Customisation instructions provided.
  • Complies with Australian & New Zealand legislation.
  • Edit documents on the go with Microsoft Office Mobile App
  • Only pay once (no subscriptions required).

Antenna Satellite Dish Installation Safe Work Method Statement

Controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Antenna Satellite Dish Installation SWMS: 

(includes potential hazards & control measures).

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Accessing the Roof using Mobile Scaffolding or Extension Ladder
  9. Fixing Equipment on the Roof Wearing a Safety Harness
  10. Running Cable & Installing Outlets
  11. Working with Powered & Non-powered Tools
  12. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
  13. On Completion
  14. Emergency Response

This Antenna/Satellite Dish Installation SWMS covers hazards and controls associated with installation of antenna’s and satellite dishes on a roof.

  • Instant Document Delivery via Email.
  • Add your logo easily.
  • Add or delete information to any SWMS template.
  • Customisation instructions provided.
  • Complies with Australian & New Zealand legislation.
  • Edit documents on the go with Microsoft Office Mobile App
  • Only pay once (no subscriptions required).

Antenna Satellite Dish Installation Safe Work Method Statement

Controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Antenna Satellite Dish Installation SWMS: 

(includes potential hazards & control measures).

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Accessing the Roof using Mobile Scaffolding or Extension Ladder
  9. Fixing Equipment on the Roof Wearing a Safety Harness
  10. Running Cable & Installing Outlets
  11. Working with Powered & Non-powered Tools
  12. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
  13. On Completion
  14. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View