null

Swimming Pool SWMS Pack 50282-1

Product SKU: 50282

Swimming Pool SWMS Pack 50282-1
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian and New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Swimming Pool Safe Work Method Statements Pack

Each Safe Work Method Statement contained within the Swimming Pool SWMS pack includes a breakdown of the job steps, general hazards and controls associated with Swimming Pool work including construction, gas pumps, fencing, maintenance and much more.

This value pack has been discounted by 30%

11 SWMS Included in Swimming Pool Pack:

Click on each of the SWMS to view more information.


SWMS within this pack can be swapped out for other alternatives, contact us for more information.

All our SWMS Include

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

Instant Document Delivery via Email

FREE Legislation & Codes of Practice Reference List

Ready to Use Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 8am to 5pm AEST, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
RRP: $989.45
$692.61   (Ex. GST)
(You save   $296.84 )

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-