Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Man replacing a red cars windshield.

Windshield Replacement - Standard Vehicles Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Windshield Replacement Safe Work Method Statement

This Windshield Replacement Safe Work Method Statement (SWMS) covers hazards and controls associated with the replacement of vehicle windshields.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor.

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Windshield Replacement SWMS:

(includes potential hazards & control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Environment
  3. Housekeeping
  4. Manual Tasks
  5. Windshield Removal and Replacement
  6. On Completion
  7. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Windshield Replacement Safe Work Method Statement

This Windshield Replacement Safe Work Method Statement (SWMS) covers hazards and controls associated with the replacement of vehicle windshields.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor.

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Windshield Replacement SWMS:

(includes potential hazards & control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Environment
  3. Housekeeping
  4. Manual Tasks
  5. Windshield Removal and Replacement
  6. On Completion
  7. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View