Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Grave, Excavator, Digging, Preparation

Grave Preparation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Grave Preparation Safe Work Method Statement

This Grave Preparation Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting grave preperation work.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work in an area that may have a contaminated or flammable atmosphere
  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services

Additional controls are included for Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Grave Preparation SWMS:

(includes potential hazards & control measures)

  1. Planning
  2. Training
  3. Working Outdoors
  4. Arrival On-site & Assess Onsite Conditions
  5. Delivery & Removal of Mobile Plant
  6. Work Area Set-up
  7. Environment
  8. Housekeeping
  9. Grave Preperation - Grass Removal
  10. Grave Digging
  11. Shore Up The Excavation
  12. Water Charged Ground
  13. Make-safe The Excavation
  14. Artificial Grass, Board & Chair Placement
  15. Changing Attachments
  16. Operations with Hydraulic Attachments
  17. Fuelling The Plant
  18. On Completion
  19. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Grave Preparation Safe Work Method Statement

This Grave Preparation Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting grave preperation work.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work in an area that may have a contaminated or flammable atmosphere
  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services

Additional controls are included for Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Grave Preparation SWMS:

(includes potential hazards & control measures)

  1. Planning
  2. Training
  3. Working Outdoors
  4. Arrival On-site & Assess Onsite Conditions
  5. Delivery & Removal of Mobile Plant
  6. Work Area Set-up
  7. Environment
  8. Housekeeping
  9. Grave Preperation - Grass Removal
  10. Grave Digging
  11. Shore Up The Excavation
  12. Water Charged Ground
  13. Make-safe The Excavation
  14. Artificial Grass, Board & Chair Placement
  15. Changing Attachments
  16. Operations with Hydraulic Attachments
  17. Fuelling The Plant
  18. On Completion
  19. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View