Demolition - Vessel Safe Work Method Statement

Product SKU: 10659-1

Vessel being prepared for demolition.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Demolition - Vessel Safe Work Method Statement

This Demolition - Vessel Safe Work Method Statement (SWMS) covers hazards and controls associated with controlling the Demolitin Vessel.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile Plant Movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Night Work, Hot Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Demolition - Vessel SWMS:

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Arrival On-Site & Assess Onsite Conditions
  3. Establish Safe Work Zone (Safe Set-Up)
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Delivery, Set-Up & Removal of the Excavator
  8. Establish a Communication System with Pedestrian Ground Workers
  9. Vessel Demolition
  10. Loading Trucks/Skips
  11. Trimming Steel Using Grinder or Cut-Off Saw
  12. Changing Attachments
  13. Operations with Hydraulic Attachments
  14. Fuelling the Plant
  15. On Completion
  16. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Demolition - Vessel Safe Work Method Statement

    This Demolition - Vessel Safe Work Method Statement (SWMS) covers hazards and controls associated with controlling the Demolitin Vessel.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile Plant Movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Night Work, Hot Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Demolition - Vessel SWMS:

    (includes potential hazards and control measures)

    1. Working Outdoors
    2. Arrival On-Site & Assess Onsite Conditions
    3. Establish Safe Work Zone (Safe Set-Up)
    4. Environment
    5. Housekeeping
    6. Manual Tasks
    7. Delivery, Set-Up & Removal of the Excavator
    8. Establish a Communication System with Pedestrian Ground Workers
    9. Vessel Demolition
    10. Loading Trucks/Skips
    11. Trimming Steel Using Grinder or Cut-Off Saw
    12. Changing Attachments
    13. Operations with Hydraulic Attachments
    14. Fuelling the Plant
    15. On Completion
    16. Emergency Response